우리와 건축 | 덴버 콜로라도 720-984-9854

본문 바로가기

905 Model's Finising Work After Blowing

Blown end joist(Rear door)
1.D/S end joist
2.blown end joist foam gaps and cover plastic
Fire place
1.foam resistive pannel
mechanical room1
1.foam duct gaps
2.R19 ceiling
Wood post
1.Cover plastic
stairs wall gaps
1.Cover plastic bottom wall
2.R19 upper stair gap
Stair wall(basement)
1.Cover plastic wall
D/S end joist of basement
Blown basic1
1.Cut gas valve
Blown basic2
1.Cut drain pipes
2.Cut concent
3.Cut duct
Blown basic3
1.Cut drain pipes
Blown basic4
1.foam resistive pannel
Blown basic5
1.R19 joist

CAUTION

1. Checkup Foam & gap of walls
2. Checkup Cutting Pipes & Electrical Concents into all walls