904 Model's Finising Work After Blowing
| Stair Box 1.Cover plastic(5 studs) |
![]() |
|---|---|
| Stair wall(no basement) 1.Cover plastic |
![]() |
| Water pipes Box 1.Cover plastic |
![]() |
| Steel post 1.Cover plastic bothside and top |
![]() |
| under Box 1.Cover plastic top and bottom ceiling |
![]() |
| Stair wall(basement) | ![]() |
| End joist(basement) | ![]() |
| Blown basic1 1.Cut concent 2.Cut gas valve |
![]() |
| Blown basic2 1.Cut drain pipes 2.Cut concent 3.Cut Duct |
![]() |
| Blown basic3 1.Cut drain pipe |
![]() |
| Blown basic4 1.foam resistive pannel |
![]() |
| Blown basic5 1.R19 FSK(Foil) Joist |
![]() |
CAUTION |
1. Checkup Foam & gap of walls 2. Checkup Cutting Pipes & Electrical Concents into all walls |











